DESCRIPTION: Heavy rain storm hit London, Ontario on September 10, 2014. Foundation drains are working overtime clearing water to the sump pit for the Zoeller M98 1/2hp sump pump to eject into the city's storm drain. Battery back-up pump ready in case power goes out, but this is an incredible amount of water.